Three operating theatres installed in one weekend

14 February 2018 | News articles

On the instructions of UMC Utrecht, three additional operating theatres were installed at the Wilhelmina Children’s Hospital over the weekend of 10-11 February. The operating complex, which includes technical space and consists of 45 modular units, was installed in a steel structure over six metres in height. The operating theatres will be operational from the end of May.

Jan Snel Medical Buildings will continue to put the finishing touches on the operating theatres over the coming weeks. In the meantime, the entire building will be fitted with systems and connected to the existing accommodation. The 3 additional operating theatres will form an integrated whole with the existing operating complex.